IMP/TIP memory retrofit schedule (rev 2) (RFC0476)

IP.com Disclosure Number: IPCOM000003621D
Original Publication Date: 1973-Mar-07
Included in the Prior Art Database: 2000-Sep-13
Document File: 2 page(s) / 2K

Publishing Venue

Internet Society Requests For Comment (RFCs)

Related People

A.M. McKenzie: AUTHOR

Abstract

This revision contains two types of changes to RFC #447. First, the retrofits to Utah, Belvoir, NOAA, USC, Stanford, ISI, Case, and CCA have been completed and are therefore removed from the schedule. Second, the retrofits to UCSB, ETAC, Aberdeen, and Rome have been rescheduled.

This text was extracted from a ASCII Text document.
This is the abbreviated version, containing approximately 100% of the total text.

Network Working Group Alexander McKenzie

RFC # 476 BBN-NET

NIC # 14920 March 7, 1973

IMP/TIP Memory Retrofit Schedule (Revision 2)

This revision contains two types of changes to RFC #447. First, the

retrofits to Utah, Belvoir, NOAA, USC, Stanford, ISI, Case, and CCA have

been completed and are therefore removed from the schedule. Second, the

retrofits to UCSB, ETAC, Aberdeen, and Rome have been rescheduled.

The revised text of RFC #447 follows:

During the first several months of 1973 we will be retrofitting each IMP

and TIP with additional core memory. At the end of the retrofit

program, the memory sizes of the various machines will be as follows:

IMP (516 or 316) - 16K words

TIP - 28K words

TIP with Magnetic Tape Option - 32K words

In addition, the expansion of the TIP core memory will necessitate

enlarging the TIP to two cabinets.

Listed below is the schedule for the remaining retrofits. We have

arranged this schedule to coincide with the usual monthly Preventive

Maintenance at each site so as to minimize user inconvenience, but the

work required will frequently require the machines to be down longer

than normal. I will issue additional RFC's updating this schedule as

necessary.

Any site which anticipates difficulty with the expansion of TIP size,

and thus the floor space requirement, should contact Hawley Rising (BBN)

at

(617)491-1850 ext. 473

All dates given below are below in the form (month/day)

SRI (3/7)

ETAC (3/15)

FNWC (3/15

Rome (3/16)

UCLA (3/19)

AMES IMP (3/21)

GWC (3/22)

Carnegie (4/4)

SDC (4/17)

Illinois (4/18)

UCSB (5/1)

Aberdeen (postponed indefinitely)