Browse Prior Art Database

Reverse Engineering Lost Circulation Material Formulations to Improve Efficiency

IP.com Disclosure Number: IPCOM000232131D
Publication Date: 2013-Oct-18
Document File: 3 page(s) / 116K

Publishing Venue

The IP.com Prior Art Database

Abstract

There are many variations and types of lost circulation materials (LCM) that have evolved over time. Much of this is marketing, but some of it is aimed at technology improvement. This work was aimed at applying reverse engineering concepts by reviewing a current successful commercial LCM to make it more effective and efficient.

This text was extracted from a PDF file.
This is the abbreviated version, containing approximately 52% of the total text.

Page 01 of 3

CM perform

st Circulatio

ons and type

ing, but some

eering conce

icient. 

of the bigges illing in which

ut it is safe t

r drilling a we

efore, any te duced drillin

m, engineere

 time caused

o lost circula

lation mitigat

here the LC

ual path take

ed material i mbination of

ow particle s

ing plugged. 

was selected

improved. It  er (ABF); 15%

 a dispersant

erformance c

rger ground 0 and 1680 m

 tested on co

taining xant nd one non‐

ance optimiz

n Material Fo

s of lost circu

 of it is aime

pts by review

t contributor

 to make eco

o say that it r


ll. As rig rate

chnology tha g costs. 

d solutions d

 by lost circu tion problem

ion that has  M needs to b

n is to select

n this applica

 different typ

ize distributio

 for reformu is an acid deg

 each of gro  and binder. 

ould be imp  marble; flake

icrons and t

nstant area s

han polymer  aqueous fluid

ation based o

rmulations to

lation mater

d at technolo

ing a current

s to drilling n nomic decisi

epresents a v

s increase, th

t reduces dri

esigned to im

lation are off

s that incorp

lagged in pro

e removed t  all of the co

tion is calciu es and sizes 

n (PSD), unle

lation to asce

radable LCM

und marble (

This is a pelle roved other a

 calcium car he ABF.  

lots in a part

weighted to 

n solution ex

 Improve Eff

ials (LCM) th gy improvem

 successful c

on‐productiv

ons. Estimat ery large po e economic 

lling non‐pro

prove wellb ered. This se orates both u

ducing multi o make hydro

mponents fro

m carbonate  of LCM is mo

ss that PSD i

rtain whethe

 whose curre

GM) with res

tized produc

cid soluble L

bonate; large

icle plugging

12 ppg with 

perience 

iciency 

at have evolv

ent. This wo

ommercial LC

e time, and i ions of econo ortion of the t impact of no ductive time 

ore strength 

ervice provide

nique plann

ple solutions  carbon flow

m acid solub

based compo

re efficient th

s tailored to 

r the produc

nt formulati

pective d50's

t.  

CM was subs

 size calcium

 apparatus (P

barite as wel

Reverse E

Abstract 

There are

Much of t

applying r

more effe

Introduct

Lost circu difficult se

segment v

productiv

increases  millions o

To addres

drilling no

engineere

materials

Developm

One area  reservoir  to the we materials experienc

of materia

fracture s

A comme performa 50% acid  25, and 15

To evalua into the fo

carbonate

 

The formu

using a sim

two wate  

L

ngineering Lo

 many variati

his is market everse engin

ctive and eff

ion 

lation is one  gment of dr ary widely, b

e expense fo as well. Ther

f dollars in re

s this proble n‐productive

d approach t

.   

ent 

for lost circu applications w

llbore. The us

. The most us

e is that a co

l with a n...