The bisiness model in the test phase using cheap H/W (cpu, disk, memory) which utilized the simulation of OS and H/W with high cost, high availablity and high reliability

IP.com Disclosure Number: IPCOM000238622D
Publication Date: 2014-Sep-08
Document File: 3 page(s) / 156K

Publishing Venue

The IP.com Prior Art Database

Abstract

In test development and maintenance phases, such as UT (Unit test), IT (Integration Test), some part of ST (System Test) and maintenance phases, expensive H/W componets (CPU, memory, disk, etc), which are positioned by the expensive flagship machine with high cost, high availablity and high reliability are not required, because the aiming of the target tests are checking the program logic, interface and DB contents. If the expensive high cost H/W can be set to low cost H/W without losing high availablity and high reliability and the simulation can be carried out by software at low cost, the cost can be dramatically reduced. This idea is to reduce the project cost, especially the cost of H/W and man power sharply, while it aims at reducing project risk factors sharply by seamless low cost machine environment which makes shift machine environment and man power in each phase. The key point of this model is to view the life cycle of system within UT, IT, ST, maintenance phases.

This text was extracted from a PDF file.
This is the abbreviated version, containing approximately 100% of the total text.

Page 01 of 3

The bisiness model in the test phase using cheap H/W (cpu, disk, memory) which utilized the simulation of OS and H/W with high cost, high availablity and high reliability

In test development and maintenance phases, such as UT (Unit test), IT (Integration Test), some part of ST (System Test) and maintenance phases, expensive H/W componets (CPU, memory, disk, etc), which are positioned by the expensive flagship machine with high cost, high availablity and high reliability are not required, because the aiming of the target tests are checking the program logic, interface and DB contents. If the expensive high cost H/W can be set to low cost H/W without losing high availablity and high reliability and the simulation can be carried out by software at low cost, the cost can be dramatically reduced. This idea is to reduce the project cost, especially the cost of H/W and man power sharply, while it aims at reducing project risk factors sharply by seamless low cost machine environment which makes shift machine environment and man power in each phase. The key point of this model is to view the life cycle of system within UT, IT, ST, maintenance phases.

Here are the charts describing the idea.

1


Page 02 of 3

2


Page 03 of 3

3