Fail Pin Automatic Positioning Tool Development

IP.com Disclosure Number: IPCOM000241886D
Publication Date: 2015-Jun-05
Document File: 4 page(s) / 2M

Publishing Venue

The IP.com Prior Art Database

Abstract

This paper discusses the development of a fail pin automatic positioning tool. This tool can help final test or probe test automatic positioning issue hardware and save maintenance time. The tool is easy for engineers to operate and use, which this will increase final test output and overall equipment efficiency.

This text was extracted from a Microsoft Word document.
At least one non-text object (such as an image or picture) has been suppressed.
This is the abbreviated version, containing approximately 54% of the total text.

Fail Pin Automatic Positioning Tool Development

Abstract

 This paper discusses the development of a fail pin automatic positioning tool. This tool can help final test or probe test automatic positioning issue hardware and save maintenance time. The tool is easy for engineers to operate and use, which this will increase final test output and overall equipment efficiency.

Keywords

Fail pin automatic positioning tool. Site variation. Pin Diagram. Socket

Background

In final test process, often due to hardware setup issue lead to individual test site Bin8 (Open/Short) or leakage issue, lead to test site close automatically or serious site variation.  It seriously influences testing parallelism and final output by hour. At this point, engineers need to follow these four steps to solve the site issue:

1. Set up datalog.

2. Check the failed pin from datalog.

3. Check the location of failed pin from pin diagram.

4. Change or repair the pin at issue.

This is the current process for pogo pin repair or change during production maintenance. (Example shown asFigure 1).

Figure 1. The current process for pogo pin repair or change during production maintenance

The difficulty is with the pogo pin positioning. The current method of pogo pin positioning has 3 disadvantages:

1. Time – it takes on average about 5 minutes.

2. Only engineer has authority to set up datalog, which leads to low efficiency on process.

3. Only engineer has pin diagram of every product, which leads to low efficiency.

Solution

Develop a pogo pin automatic positioning tool. This tool has below function:

1. Database including the pin diagram of all products and all packages.

2. Auto collect datalog without any setup manually.

3. A...