Browse Prior Art Database

Open Hole Zone Isolation

IP.com Disclosure Number: IPCOM000250511D
Publication Date: 2017-Jul-26
Document File: 1 page(s) / 24K

Publishing Venue

The IP.com Prior Art Database

Abstract

Hydraulic / hydrostatic packer is set as past of initial run-in and fracturing. Re-active element packer is set based on time and fluid exposure and temp. Based on time and fluid exposure and temperature which can handle higher pressure differntials than the initially set hydraulic hydrostatic packer.

This text was extracted from a PDF file.
This is the abbreviated version, containing approximately 100% of the total text.