Dismiss
InnovationQ and the IP.com Prior Art Database will be updated on Sunday, December 15, from 11am-2pm ET. You may experience brief service interruptions during that time.

Month of October 2007 - Page Number 10

Showing 91 - 100 of 521 from October 2007
Browse Prior Art Database
  1. 91.
    For the backend applications, special lithographic patterns have to be structured for the following process steps. Particularly, the electrochemical plating process is carried out to form a metal layer on the wafer surface. During this process, the wafer surface or parts of it are exposed to an electroplating solution...
    IPCOM000158927D | Original Publication Date: 2007-Oct-25
  2. 92.
    In 3GPP MBMS the following problem may occur (3GPP: 3rd Generation Partnership Project, MBMS: Multimedia Broadcast/Multicast Services). The RNC (Radio Network Controller) detects a long inactivity period of user data during the MBMS session. In this case it is not able to decide whether the reason for this inactivity...
    IPCOM000158814D | Original Publication Date: 2007-Oct-25
  3. 93.
    The gsmSCF (Global System for Mobile communications Service Control Function) address is used to access the gsmSCF (i.e. the SCP (Service Control Point) in a physical entity) for a particular subscriber (normally the MSC – Mobile Switching Center). One gsmSCF address is allocated to one trigger criterion. The gsmSCF...
    IPCOM000158813D | Original Publication Date: 2007-Oct-25
  4. 94.
    Today, there are systems available that direct drivers of individual motor traffic to certain parking areas. This is helpful but still leaves the driver with the problem to find an available parking spot in that area. The guidance of a driver to a specific parking spot that can be matched to his/her specific needs...
    IPCOM000158812D | Original Publication Date: 2007-Oct-25
  5. 95.
    The editorial focus for this issue of the Motorola Software Technical Journal is Enabling Seamless Mobility. This topic is rich in opportunities for research and education – two of the main goals of this Journal. The Journal is organized into eight sections -- one for each Software Technology Group. Seamless...
    IPCOM000159692D | Original Publication Date: 2007-Oct-01
  6. 96.
    A process for rating the quality of data based on social relationship and a trust adjustment factor.
    IPCOM000159708D | Original Publication Date: 2007-Oct-25
  7. 97.
    Sequence Bookmarks
    IPCOM000159707D | Original Publication Date: 2007-Oct-25
  8. 98.
    ID839068
    IPCOM000159700D | 2007-Oct-25
  9. 99.
    IPCOM000159697D | Original Publication Date: 2007-Oct-25
  10. 100.
    In a bottom-up design flow, the project manager is generally required to maintain the top-level project and ensure that all lower-level projects have a consistent view of the design requirements.
    IPCOM000159696D | 2007-Oct-24